Remodeling · 26 Plumbing · 19 HVAC · 17 Demolition · 12 Roofing · 3 Foundation · 2 Fencing · 2 Electrical · 1
| Issued | Address | Work description | Est. value | |
|---|---|---|---|---|
| 2026-11-05 | 595 MADISON AVENUE, Manhattan · 10022 | Filing herewith for interior removal and installation of non load bearing partition, ceiling, doors and floors as per plans. No change to use, egress or occupancy. | $3,999,960 | |
| 2026-11-05 | 560 LEXINGTON AVENUE, Manhattan · 10022 | FILING FOR MECHANICAL WORK ASSOCIATED WITH INTERIOR DEMO OF 8TH, 9TH, AND 10TH FLOORS AS PER PLANS SUBMITTED HEREWITH. HVACDemolition | $100,000 | |
| 2026-11-05 | 560 LEXINGTON AVENUE, Manhattan · 10022 | FILING FOR INTERIOR DEMO FOR 8TH, 9TH, AND 10TH FLOOR OFFICE SPACE AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. Demolition | $750,000 | |
| 2026-11-05 | 125 EAST 50 STREET, Manhattan · 10022 | Application filed to reduce the size of the restaurant and add a new retail store. Removal and installation of walls, doors, floor finishes and ceilings as per plans | $46,133 | |
| 2026-11-05 | 25 SUTTON PLACE SOUTH, Manhattan · 10022 | INTERIOR RENOVATION TO EXISTING APARTMENT 20L ON THE 20 FLOOR. RENOVATION OF BATHROOMS , AND MINOR PARTITIONS WORK , ALL AS PER PLAN NO CHANGE IN USE EGRESS OR OCCUPANCY . Remodeling | $85,000 | |
| 2026-11-05 | 136 EAST 55 STREET, Manhattan · 10022 | Structural repairs of garage slab and steel beams. No change in use, egress, or occupancy. Foundation | $75,000 | |
| 2026-11-05 | 16 SUTTON PLACE, Manhattan · 10022 | INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. L | $1,000 | |
| 2026-11-05 | 401 EAST 51 STREET, Manhattan · 10022 | INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. L | $1,000 | |
| 2026-11-05 | 60 EAST 54 STREET, Manhattan · 10022 | INSTALLATION OF HEAVY DUTY SIDEWALK SHED AND CONSTRUCTION PLYWOOD FENCE AS PER PLANS. TEMPORARY EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS O Fencing | $17,000 | |
| 2026-11-04 | 450 PARK AVENUE, Manhattan · 10022 | Modifications to the existing sprinkler system on the 8th floor (Ocean Sound) as per plans. No change to use, egress or occupancy. | $29,999 | |
| 2026-11-04 | 540 MADISON AVENUE, Manhattan · 10022 | Architectural modifications taking place on the 3rd floor as per plans filed herewith. No change in use, egress or occupancy. | $65,869 | |
| 2026-11-04 | 18 EAST 50 STREET, Manhattan · 10022 | HEREWITH FILING FOR THE INSTALLATION OF A FUEL STORAGE TANK FOR NEW GENERATOR. | $371,640 | |
| 2026-11-04 | 540 MADISON AVENUE, Manhattan · 10022 | Architectural modifications taking place on 35C/36M as per plans filed herewith. No change in use, egress or occupancy. | $799,960 | |
| 2026-11-04 | 595 MADISON AVENUE, Manhattan · 10022 | Structural work for the cooling tower railing extension on the 18th floor as indicated on drawings. Foundation | $50,537 | |
| 2026-11-04 | 25 SUTTON PLACE SOUTH, Manhattan · 10022 | INTERIOR ALTERATION TO EXISTING APT. 6B ON THE 6TH FLOOR. GENERAL CONSTRUCTION WORK, DEMOLISH AND CONSTRUCT NON-STRUCTURAL INTERIOR PARTITIONS, DOORS, FINISHES. RENOVATE EX. BATHR RemodelingDemolition | $140,000 |