Home › New York City, NY › ZIP 10017
Plumbing · 19 HVAC · 17 Remodeling · 15 Demolition · 7 Foundation · 6 Roofing · 2 Fencing · 2 Decks & Patios · 1
| Issued | Address | Work description | Est. value | |
|---|---|---|---|---|
| 2026-11-05 | 633 3 AVENUE, Manhattan · 10017 | REMOVAL OF CONVENIENCE STAIR AND FRAMING FOR CLOSING CONVENIENCE STAIR'S OPENING BETWEEN 33RD AND 34TH FL AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $60,000 | |
| 2026-11-05 | 12 EAST 49 STREET, Manhattan · 10017 | Plumbing work on the 28th floor construction (29th floor marketing) as indicated on drawings. Plumbing | $39,000 | |
| 2026-11-05 | 375 MADISON AVENUE, Manhattan · 10017 | THE FIRE PROTECTION SCOPE OF WORK SUBMITTED UNDER THIS APPLICATION ENTAILS DEMOLITION OFEXISTING MEP SERVICES. THE SYSTEMS INCLUDE SPRINKLER PIPING, MAINS, SPRINKLER CONTROL VALVE Demolition | $1,213,563 | |
| 2026-11-05 | 280 PARK AVENUE, Manhattan · 10017 | Additions and Modification to existing Sprinkler system and plumbing system as per plans filed herewith. No change in use, egress or occupancy under this application. Plumbing | $98,496 | |
| 2026-11-05 | 375 MADISON AVENUE, Manhattan · 10017 | Filing herewith for installation of Temporary Dry Standpipe for fire protection during ongoing demolition and construction as part of redevelopment project. Demolition | $2,500,000 | |
| 2026-11-05 | 12 EAST 49 STREET, Manhattan · 10017 | Sprinkler work on the 28th floor construction (29th floor marketing) as indicated on drawings. | $36,999 | |
| 2026-11-05 | 461 5 AVENUE, Manhattan · 10017 | Suspended Scaffold for Facade Restoration as Shown on Plans | — | |
| 2026-11-05 | 343 MADISON AVENUE, Manhattan · 10017 | INSTALLATION AND USE OF TEMPORARY EXTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. HVAC | — | |
| 2026-11-05 | 240 EAST 47 STREET, Manhattan · 10017 | APARTMENT RENOVATION Remodeling | $75,000 | |
| 2026-11-05 | 145 EAST 49 STREET, Manhattan · 10017 | General construction, structural and foundation work at the cellar and first floor and increase in cellar floor area as indicated on drawings. Foundation | $135,796 | |
| 2026-11-05 | 145 EAST 49 STREET, Manhattan · 10017 | Deck Extension - excavation of cellar @ rear of building, removal of existing metal framed deck, and construction of a new 350 sf deck structure, open to above with framed privacy Decks & PatiosFoundation | $99,998 | |
| 2026-11-04 | 747 THIRD AVENUE, Manhattan · 10017 | SUBSEQUENT APPLICATION FILED FOR MECHANICAL MODIFICATION/ADDITIONS FOR HEALTH CLUB/GYM/FITNESS CENTER 2ND FL, MEZZANINE, & 2ND FL ROOF SETBACK AS PER PLANS FILED HEREWITH. NO CHA RoofingHVAC | $346,000 | |
| 2026-11-04 | 475 5 AVENUE, Manhattan · 10017 | REMOVAL AND INSTALLATION OF WALLS, DOORS, FLOOR FINISHES, AND CEILINGS IN THE 15TH-FLOOR OFFICE SPACE AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $791,800 | |
| 2026-11-04 | 575 5 AVENUE, Manhattan · 10017 | Installation of Partitions, Doors, Suspended Ceiling, Millwork, Store Fixtures, Floor & Wall Finishes to Renovate Existing Retail Store Space on Part of the Cellar & 1st Floor Incl Remodeling | $770,000 | |
| 2026-11-04 | 11 EAST 44 STREET, Manhattan · 10017 | TEMPORARY ROOF PROTECTION AT ADJOINING PROPERTIES DURING BLDG DEMOLITION, FILED SEP. ROOF PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS U RoofingHVACDemolition | $2,000 |
Every permit issued in ZIP 10017 — each one an active project at a specific address. Public records, refreshed daily.
One email a week with the newest permits for your trade and area. Tell us what you cover and we'll filter it for you. Unsubscribe anytime.